54E1 railway steel rail

$850.00 $800.00

Standard: BS, EN 13674-1
Grade: 900A/1100
Length: 12-30m
Model Number: UIC54/54E1
Type: Heavy Rail
Application: Railway Rail
Weight: 54.77 kg/m
Secondary Or Not: Non-secondary
Bolt Hole Diameter: 30mm
Product name: UIC54/54E1 Railway Rail
Key words: Railway Track
Material: 900A/1100
Usage: Railway Rail
Certificate: 3.1 MTC
Warranty: 12 months
Processing: Hot Rolled
HS CODE: 73021000
  • Description
  • Payment and Delivery terms
  • Supply international standard rails
  • Inquiry

EN13674-1 54E1 railway steel rail is used for railway road, we can produce it by order, the MOQ is 500 tons, material can be R260HB or R350HT, length can be 12-50 meters.

Drawing of 54E1 railway steel rail

Drawing of 54E1 railway steel rail

The specification as below:

Length: 12 to 50 meters;

Unit weight: 54.77 kg/m;

Production standard: UIC860;

Delivery inspection standard: EN13674 for qualifying tests and acceptance tests;

Material: R900A/R1100;

Hardness: R260HB, R350HB.

Material of 54E1 railway steel rail

The 54E1 railway steel rail is a standard rail profile that is commonly used in railway infrastructure projects around the world. It is designed to meet the requirements of heavy-duty railway operations, including freight and passenger trains.
The 54E1 rail has a weight of 54 kilograms per meter and features a standard profile with a height of 176 millimeters, a base width of 132 millimeters, and a head width of 76 millimeters. The rail also has a web thickness of 20 millimeters and a flange thickness of 25 millimeters.
The 54E1 rail is made from high-quality carbon-manganese steel that undergoes rigorous manufacturing processes to ensure optimal mechanical properties and longevity. The rail is heat-treated to increase its hardness and wear resistance, making it suitable for use in harsh operating environments.
The 54E1 railway steel rail is designed with safety in mind, featuring a continuous welded structure that minimizes the risk of rail breaks or derailments. It is also equipped with special fittings such as fishplates, bolts, and clips that ensure a secure connection between the rails and prevent movement or displacement.
To ensure the quality and reliability of the 54E1 railway steel rail, it undergoes rigorous testing and certification processes before being approved for use. These tests include tensile strength tests, impact tests, and fatigue tests, among others, to verify the rail’s mechanical properties and performance under different operating conditions.
The installation of the 54E1 railway steel rail requires specialized equipment and expertise, as well as careful planning and design. The rail must be installed on a solid foundation that can support the weight of the trains and other equipment, and it must be properly aligned and maintained to ensure optimal performance and safety.
Overall, the 54E1 railway steel rail is a reliable and durable rail product that is widely used in railway infrastructure projects around the world. Its high strength, durability, and safety features make it an ideal choice for a wide range of applications, including mainline railways, industrial tracks, and mining operations. As a supplier of railway track products, we offer a range of high-quality 54E1 railway steel rails and related components to meet the needs of our customers in the railway and industrial sectors. If you require more information or would like to request a quote, please do not hesitate to contact us.

– Standard of UIC 860 V: 1996 – prescribed four types pearlite steel rails in the range of tensile strength from 700 to 1300 MPa.

– Standard EN 13674 – 2003, provides seven types pearlite steel hardness in the range 200 to 390 HBV, types steel in accordance with EN 13674, based on the values of hardness (R 200, R 220, R 260, R 260 Mn, 320 Cr, 350 HT, 350 LHT).

Payment term: T/T, L/C

Delivery term: 30 days

Delivery port: Tianjin port

MOQ: 400 tons

Contact Us







Online Service
Live Chat