BS11-1985 standard BS90A steel rail

$800.00 $750.00

Standard: BS, DIN
Grade: 900A, min 880 N/mm2
Rail Heigth: 142.88mm
Bottom Width: 127mm
Web Thickness: 13.89mm
Head Width: 66.67mm
Length: 8-25m
Model Number: BS90A rail
Type: Heavy Rail
Application: Railway Rail
Weight: 45.1kg/m
Secondary Or Not: Non-secondary
Bolt Hole Diameter: 24mm
Tolerance: ±2%
Name: BS11-1985 standard BS90A train metal steel rail
Certificate: MTC 3.1/EN 10204 3.2
Producing standard: UIC860V
MOQ: 200 Tons
Warranty: 12 months
HS CODE: 73021000
Advantage: Competitive Prices
Material: 900A
Package: Bundle to container
Supply Ability: 5000 Ton/Tons per Day
Packaging Details: Bundle to container or bulk cargo
Port: Tianjin port

  • Description
  • Q & A
  • Our Exportable flat bottom rails:
  • Inquiry

BS11-1985 standard BS90A steel rail is used for mining railroad line or metro etc. The material is 900A, hardness is more than 880 N/mm2, length can be 8-25 meters, please contact us to ask the details.

BS11-1985 standard BS90A steel rail is a flat-bottomed railway rail that conforms to the requirements specified in both the BS 11-1985 and BS 90A standards.

BS 11-1985 refers to the 1985 edition of the British Standard titled “Specification for flat bottomed railway rails.” This standard specifies the requirements for flat-bottomed railway rails used in the UK and other countries that adopt this standard. It covers various aspects of rail design, manufacture, testing, and inspection, including material properties, dimensions, tolerances, and surface finish.

BS11-1985 standard BS90A steel rail conforms to BS 11-1985 standard, it is a flat-bottomed railway rail manufactured using a steel product that meets the requirements specified in both standards. In this case, the rail would have the necessary chemical composition, mechanical properties, and dimensional specifications outlined in BS 90A, while also meeting the additional requirements for flat-bottomed railway rails specified in BS 11-1985.

If you need BS11-1985 standard BS90A steel rail, please feel free to ask us.

Drawing of BS11-1985 standard BS90A steel rail

Drawing of BS11-1985 standard BS90A steel rail

Introduction of our manufacturer:

Rolling machine:

Why the quality of our steel rail is very good?

  1. Because we control the producing process since steel melting.

(1) Rail was produced by very specialized process.

(2) Liquid iron will be desulfurization before steel marking.

(3) Slag stoppers are used in tapping operation to eliminate or minimize the carryover of slag into the steel ladle.

(4) The steel ladle will be stirred by argon in the bottom for liquid steel temperature homogenized, steel composition uniformed and removal of nonmetallic inclusions.

(5) On the top of ladle add insulating slag as precaution after tapping.

(6) Steel temperatures, chemical compositions and deoxidation practices can be controlled more precisely by second refining. Vacuum degassing is used for removing gases such as hydrogen, oxygen and nitrogen. Improve the purity of steel through removing oxygen and removing nonmetallic inclusions by flotation.

(7) Avoid second oxidation in continuous casting through in-ladle slag carryover predication, protective casting, tundish metallurgy and mould level automatic control.

(8) Improve the surface quality and segregation through control the constant casting speed, in-mould electromagnetic stirring, dynamic control of secondary cooling and soft reduction in final stage.

(9) Rolling by Universal mill and right designing to ensure the better profile and tolerance.

(10) Two times descaling will be used to improve rail surface quality.

(11) The independent drive prebend device is used to prebend the rail reliably and remove the bending rail safely during the cooling process to reduce the residual stress.

(12) All rail shall be straightened and ultrasonically tested by a continuous process to ensure whole of rails length and specified cross sectional area are inspected fully.

  1. Arrange quality control plan according to technical specification and contract before production.
  2. Inspection and Test Plan shall be arranged as per the technical specification and contract before production.
  3. Mill’s Certificate: Products can’t be sold and dispatched from the factory if it is not qualified.
  4. Shipment: The rail will be delivered by railway or truck according to different length.
  5. Loading and unloading shall use special rail clamp, to avoid the head of rail damage.
  6. Loading plan shall be arranged before loading according to different vessel to ensure quality and safety of the goods.

Q: What's included in the service range and what is your core value?
A: Our service mainly refers to quality products, competitive price and good service for resourcing, inspection, shipment loading, and installation guidance.

Our core value is “Good product, good price, good service.”
Q: What's your offer validity period?
A: This will be decided by steel price, exchange rate and sea freight charge, normally we can keep 10 days for you, but sometime will be changed a few days. If you want to place the order, please confirm it again.

Q: What is your terms of payment?
A: T/T 30% in advance, the balance against the copy of bill of lading, or 100% irrevocable letter of credit at sight. We'll show you the photos of the products and packages before you pay the balance.

Q: What is your terms of delivery?
A: FOB, CFR, CNF, CIF, DDP, EXW and so on.

Q: How about your delivery time?
A: Generally, it will be 10-15 days after receiving your advance payment. Some type of rail should be produced by order, we will tell you the delivery time when we make the quotation for you. If we use bulk cargo, the shipping time will be very freely, but the cost is cheaper, this only for bulk goods.
Q: Can you produce according to the our special request?
A: Yes, we would like to do it, but should confirm the quantity, and confirm whether we have this roller, please tell us your request first, let's confirm the details.

Q: What is the guarantee of the quality of your products?
A: Normally should be 12 months, for special railway rail, we can submit the guarantee of five year plus.

All of our goods can accept any third party inspection.

Q: How do you make our business long-term and good relationship?
A: We maintain good quality and competitive prices in order to achieve a win-win cooperation. We will supply the correct products and make the process smoothly by our rich experience, even face any problem in the process, we will be able to solve it successfully.

Contact Us







Online Service
Live Chat