How to do the business of steel rail by T/T with us

We can accept the payment term of T/T or L/C as client’s requirement, for bigger business or some countries like Bangladesh and Pakistan, they would like to use L/C. For little business, client would like to pay for us by T/T, T/T is easy to be operated, and can save the operation cost.

Here we introduce the detailed operation process of T/T as below:

  1. You give us the detailed information of buyer’s company (your company), we make Proforma Invoice for you.
  2. You pay for us 30% payment, then send us the payment list.
  3. We get your prepayment and prepare the all goods as soon as possible, when we get the estimated delivery time, we begin to book container (then we’ll tell you the detailed delivery time).
  4. We finish all of the goods and deliver to Tianjin port and load in container (we’ll take detailed photo to you, to show the goods is loaded in container then close and seal it, we will give you the container number and seal number).
  5. After shipping out three days later, we can get the bill of lading and other documents, then we’ll send to you the copy, and you can pay for us the balance 70% payment.
  6. When we get your balance payment, we post the original documents to you, includes Bill of lading, Insurance list, Certificate of origin (Form E), Material test certificate, Commercial invoice, Packing list etc.
  7. Before the container arrive to your port, the shipping company will inform you to prepare the original documents to take the goods.

The delivery time on our quotation just be estimated time, when we begin to produce the goods, we will be able to know the exact delivery time and book the container, so we need consider the producing time, land transportation time, apply custom time etc., usually our freight forwarder request us must deliver to port before 4 days, so we need book the container after ten days later.

Sometime have uncontrollable things happened, like this COVID-19, we want to deliver goods to Labuan, Malaysia, last time there are four vessels can be chosen, but now only has one vessel, Labuan port is very far away, plus COVID-19, most vessel had been cancelled.

USAGE OF RAILS

TYPE OF RAILS

STANDARD

Rail for Railway 43 kg/m rail, 50 kg/m rail,

60 kg/m rail, 75kg/m rail, 60N rail, 75N rail

TB/T2344-2012, TB/T3276-2011
P50 rail/R50 rail, P65 rail/R65 rail GOST-R51685
S49 rail, UIC54 rail, UIC60 rail UIC860
JIS50N rail, JIS60 rail JIS E1101
AS50 rail, AS60 rail, AS68 rail AS1085, BHP RT STD
90RA rail, 100RE rail, 115RE rail, 132RE rail, 136RE rail AREMA
TR45 rail, TR50 rail,

TR57 rail, TR68 rail

ASTM
BS75A rail, BS90A rail, BS100A rail BS11 STANDARD
49E1 rail, 50E2 rail, 54E1 rail,

60E1 rail, 60E2 rail

EN 13674-1
Switch Rail 50AT1 rail, 60AT1 rail,

60AT2 rail, 60TY1 rail

TB/T3109-2013
Crane Rail A45, A55, A65, A75, A100, A120, A150 DIN536
QU70 rail/KP70 rail, QU80 rail/KP80 rail, QU100 rail/KP100 rail,

QU120 rail/KP100 rail, CR175 rail

YB/T5055-2014
ASTM A759-2000
Grooved Rail 59R2 rail, 60R2 rail EN 14811:2006

 


Online Service
Live Chat