60E1 steel rail

$800.00 $750.00

Standard: EN13674-1
Grade: R260/R320Cr/R350HT
Rail Heigth: 172mm
Bottom Width: 150mm
Web Thickness: 16.5mm
Head Width: 72mm
Length: 12-25m
Model Number: 60E1 rail
Type: Heavy Rail
Application: Railway Rail
Weight: 60.21kg/m
Secondary Or Not: Non-secondary
Bolt Hole Diameter: 24mm
Tolerance: ±2%
Name: EN13674-1 standard 60E1 train metal steel rail
Certificate: MTC 3.1/EN 10204 3.2
Producing standard: UIC860V
MOQ: 200 Tons
Warranty: 12 months
HS CODE: 73021000
Advantage: Competitive Prices
Material: 900A/1100
Package: Bundle to container or bulk cargo
Supply Ability: 5000 Ton/Tons per Day
Packaging Details: Bundle to container or bulk cargo
Port: Tianjin port

  • Description
  • Q & A
  • Our Exportable flat bottom rails:
  • Inquiry

60E1 steel rail is used for state railroad line or subway, the hardness has R260/R320Cr/R350HT, length can be 12-50 meters, we can produce it by order, the MOQ should be more than 500 tons.

60E1 steel rail belongs to the standard of EN 13674-1: Railway applications – Track – Rails – Part 1: Vignole railway rails.

EN 13674-1 is a European standard that specifies the technical requirements for Vignole railway rails, which are the most commonly used type of railway rail in Europe and other parts of the world. The standard covers various aspects of railway rail design, manufacture, testing, and inspection, including material properties, dimensions, tolerances, and surface finish.

According to EN 13674-1, the 60E1 steel rail is classified as a UIC 60 type rail, which means it has a weight per meter of 60 kilograms and conforms to the specifications set by the International Union of Railways (UIC). The “E1” in the designation indicates that the rail meets additional requirements for high-strength and wear-resistant steel.

The EN 13674-1 standard also specifies the minimum mechanical properties of the 60E1 steel rail, including yield strength, ultimate tensile strength, elongation, and hardness. These properties are critical in ensuring the rail’s ability to withstand the extreme loads and stresses associated with heavy-duty rail transportation.

Overall, the 60E1 steel rail is a high-quality railway rail that meets the rigorous standards set by EN 13674-1 and is widely used in heavy-duty rail transportation systems worldwide. Its compliance with this standard ensures its safety, reliability, and performance, making it a trusted choice for railway operators and infrastructure managers.

Profile of 60E1 steel rail

Profile of 60E1 steel rail

Material of 60E1 steel rail

Material of 60E1 steel rail

Introduction of our manufacturer:

Rolling machine:Rolling machine of 60E1 steel rail

Cooling bed and Straightener

Hot stamping and Online heat treatment

Cutting, sawing and drilling

Transport 500m length rail by train

Why the quality of our steel rail is very good?

  1. Because we control the producing process since steel melting.

(1) Rail was produced by very specialized process.

(2) Liquid iron will be desulfurization before steel marking.

(3) Slag stoppers are used in tapping operation to eliminate or minimize the carryover of slag into the steel ladle.

(4) The steel ladle will be stirred by argon in the bottom for liquid steel temperature homogenized, steel composition uniformed and removal of nonmetallic inclusions.

(5) On the top of ladle add insulating slag as precaution after tapping.

(6) Steel temperatures, chemical compositions and deoxidation practices can be controlled more precisely by second refining. Vacuum degassing is used for removing gases such as hydrogen, oxygen and nitrogen. Improve the purity of steel through removing oxygen and removing nonmetallic inclusions by flotation.

(7) Avoid second oxidation in continuous casting through in-ladle slag carryover predication, protective casting, tundish metallurgy and mould level automatic control.

(8) Improve the surface quality and segregation through control the constant casting speed, in-mould electromagnetic stirring, dynamic control of secondary cooling and soft reduction in final stage.

(9) Rolling by Universal mill and right designing to ensure the better profile and tolerance.

(10) Two times descaling will be used to improve rail surface quality.

(11) The independent drive prebend device is used to prebend the rail reliably and remove the bending rail safely during the cooling process to reduce the residual stress.

(12) All rail shall be straightened and ultrasonically tested by a continuous process to ensure whole of rails length and specified cross sectional area are inspected fully.

  1. Arrange quality control plan according to technical specification and contract before production.
  2. Inspection and Test Plan shall be arranged as per the technical specification and contract before production.
  3. Mill’s Certificate: Products can’t be sold and dispatched from the factory if it is not qualified.
  4. Shipment: The rail will be delivered by railway or truck according to different length.
  5. Loading and unloading shall use special rail clamp, to avoid the head of rail damage.
  6. Loading plan shall be arranged before loading according to different vessel to ensure quality and safety of the goods.

Q: What's included in the service range and what is your core value?
A: Our service mainly refers to quality products, competitive price and good service for resourcing, inspection, shipment loading, and installation guidance.

Our core value is “Good product, good price, good service.”
Q: What's your offer validity period?
A: This will be decided by steel price, exchange rate and sea freight charge, normally we can keep 10 days for you, but sometime will be changed a few days. If you want to place the order, please confirm it again.

Q: What is your terms of payment?
A: T/T 30% in advance, the balance against the copy of bill of lading, or 100% irrevocable letter of credit at sight. We'll show you the photos of the products and packages before you pay the balance.

Q: What is your terms of delivery?
A: FOB, CFR, CNF, CIF, DDP, EXW and so on.

Q: How about your delivery time?
A: Generally, it will be 10-15 days after receiving your advance payment. Some type of rail should be produced by order, we will tell you the delivery time when we make the quotation for you. If we use bulk cargo, the shipping time will be very freely, but the cost is cheaper, this only for bulk goods.
Q: Can you produce according to the our special request?
A: Yes, we would like to do it, but should confirm the quantity, and confirm whether we have this roller, please tell us your request first, let's confirm the details.

Q: What is the guarantee of the quality of your products?
A: Normally should be 12 months, for special railway rail, we can submit the guarantee of five year plus.

All of our goods can accept any third party inspection.

Q: How do you make our business long-term and good relationship?
A: We maintain good quality and competitive prices in order to achieve a win-win cooperation. We will supply the correct products and make the process smoothly by our rich experience, even face any problem in the process, we will be able to solve it successfully.

Contact Us







Online Service
Live Chat