EN13674-1 50E2 kuanzishwa kwa reli ya chuma

EN13674-1 50E2 reli ya chuma pia itaitwa reli ya 50EB-T, Tunaweza kuizalisha kwa utaratibu, MOQ ni 500 Tani, Ugumu wa 260HB, Urefu unaweza kuwa 12 kwa 25 Mita.

Mchoro kama hapa chini:

EN13674-1 50E2 ni kiwango cha uainishaji wa reli ya chuma huko Ulaya. Inabainisha mahitaji ya maelezo ya reli ya hali ya juu, Kwa upande wa kemikali zao, mali ya mitambo, na uvumilivu wa dimensional. ya “50E2” inahusu aina maalum ya wasifu iliyofafanuliwa na kiwango. These rails are commonly used in railway tracks for heavy-duty freight and passenger trains.

50E2 steel rail is a type of standard heavy steel rail used for railway tracks. Its specifications include:

– Uzito wa reli: 50.4 kilo/m
– Urefu wa reli: 180 mm
– Upana wa chini: 150 mm
– Upana wa kichwa: 75 mm
– Unene wa wavuti: 16.5 mm
– Urefu: Typically 12-25 Mita

50E2 steel rail is commonly used in high-speed railways and mainline tracks, and it meets the requirements of the European standard EN 13674-1.

Installing 50E2 steel rail requires specialized equipment and trained professionals. Here are the general steps for installation:

1. Clear the area and prepare the foundation: The area where the rail is to be installed must be cleared of any debris and leveled. The foundation must also be prepared according to the specifications of the rail manufacturer.

2. Pre-assemble the rail: Before laying the rail, the individual sections should be pre-assembled and joined together with rail joint bars and bolts.

3. Lay the rail: The pre-assembled rail sections are then laid out on the prepared foundation and secured using rail clips that are attached to the sleepers.

4. Adjust the alignment and gauge: The rail must be adjusted for proper alignment and gauge, which is the distance between the two rails on a track. This is done using specialized equipment such as a rail inspector’s gauge and a rail aligning device.

5. Secure the rail: Once the rail is properly aligned and in gauge, it should be fastened securely to the sleepers using rail clips, track bolts, and lock washers.

6. Conduct quality checks: After installation, quality checks such as ultrasonic rail testing and visual inspections should be conducted to ensure the rail is installed correctly and meets safety standards.

It is important to note that installing rail is a complex and dangerous task that should only be performed by trained professionals using appropriate safety measures and equipment.

We can supply all kinds of Chinese standard steel rails as below:

RELI NYEPESI: 4kg/6kg/8kg/9kg/10kg/12kg/15kg/18kg/20kg/22kg/24kg/28kg/30kg steel rail for mine using.

RELI NZITO: 33kg/38kg/40kg/43kg/46kg/50kg/60kg/75kg for freight railroad line.

RELI YA CRANE: QU70/QU80/QU100/QU120 kwa reli ya Crane inayoendesha.


Huduma ya Mtandaoni
Gumzo la Moja kwa Moja