Tag - QU70/QU80 Crane rail Installation procedure

QU70/QU80 Crane rail Installation procedure For Crane Running at Harbors and Wharfs

QU70/QU80 Crane rail Installation procedure For Crane Running at Harbors and Wharfs. Normally Crane rail can’t be welded on bottom structure directly, because the material is high manganese steel, it is difficult to be welded, plus the Expansion and Contraction, so it needs to be fixed by the special rail fastener. If we supply the material and do the installation work, the operation procedure as below: Buy the material: Pay for us 30% prepayment to produce the goods, then transport to seaport and [...]

Online Service
Live Chat