Jinsi ya kufanya biashara ya reli ya chuma na T / T na sisi

Tunaweza kukubali muda wa malipo ya T / T au L / C kama mahitaji ya mteja, kwa biashara kubwa au baadhi ya nchi kama Bangladesh na Pakistan, Wanataka kutumia L/C. Kwa biashara ndogo, Mteja angependa kulipa kwa T/T, T/T is easy to be operated, and can save the operation cost.

Here we introduce the detailed operation process of T/T as below:

  1. You give us the detailed information of buyer’s company (your company), we make Proforma Invoice for you.
  2. You pay for us 30% payment, then send us the payment list.
  3. We get your prepayment and prepare the all goods as soon as possible, when we get the estimated delivery time, we begin to book container (then we’ll tell you the detailed delivery time).
  4. We finish all of the goods and deliver to Tianjin port and load in container (we’ll take detailed photo to you, to show the goods is loaded in container then close and seal it, we will give you the container number and seal number).
  5. After shipping out three days later, we can get the bill of lading and other documents, then we’ll send to you the copy, and you can pay for us the balance 70% payment.
  6. When we get your balance payment, we post the original documents to you, includes Bill of lading, Insurance list, Certificate of origin (Form E), Material test certificate, Ankara ya kibiashara, Packing list etc.
  7. Before the container arrive to your port, the shipping company will inform you to prepare the original documents to take the goods.

The delivery time on our quotation just be estimated time, when we begin to produce the goods, we will be able to know the exact delivery time and book the container, so we need consider the producing time, land transportation time, apply custom time etc., usually our freight forwarder request us must deliver to port before 4 Siku, so we need book the container after ten days later.

Sometime have uncontrollable things happened, like this COVID-19, we want to deliver goods to Labuan, Malaysia, last time there are four vessels can be chosen, but now only has one vessel, Labuan port is very far away, plus COVID-19, most vessel had been cancelled.

MATUMIZI YA RELI

AINA YA RELI

KIWANGO CHA

Reli kwa Reli 43 reli ya kg /m, 50 reli ya kg /m,

60 reli ya kg /m, 75reli ya kg /m, 60N reli, 75N reli

TB/T2344-2012, TB/T3276-2011
Reli ya P50/Reli ya R50, Reli ya P65/Reli ya R65 GOST-R51685
Reli ya S49, Reli ya UIC54, Reli ya UIC60 UIC860
Reli ya JIS50N, Reli ya JIS60 JIS E1101
Reli ya AS50, Reli ya AS60, Reli ya AS68 AS1085, BHP RT STD
90Reli ya RA, 100Reli ya RE, 115Reli ya RE, 132Reli ya RE, 136Reli ya RE AREMA
Reli ya TR45, Reli ya TR50,

Reli ya TR57, Reli ya TR68

ASTM
Reli ya BS75A, Reli ya BS90A, Reli ya BS100A KIWANGO CHA BS11
49Reli ya E1, 50Reli ya E2, 54Reli ya E1,

60Reli ya E1, 60Reli ya E2

EN 13674-1
Badilisha Reli 50Reli ya AT1, 60Reli ya AT1,

60Reli ya AT2, 60Reli ya TY1

TB/T3109-2013
Reli ya Crane A45, A55, A65, A75, A100, A120, A150 DIN536
Reli ya QU70/Reli ya KP70, Reli ya QU80/Reli ya KP80, Reli ya QU100/Reli ya KP100,

Reli ya QU120/Reli ya KP100, Reli ya CR175

YB / T5055-2014
ASTM A759-2000
Reli ya Grooved 59Reli ya R2, 60Reli ya R2 EN 14811:2006

 


Huduma ya Mtandaoni
Gumzo la Moja kwa Moja