Reli ya Crane КР-100 GOST Р 53866-2010 ni aina maalum ya reli ambayo imeundwa kuhimili mizigo nzito na mafadhaiko yanayohusiana na shughuli za crane. Ina urefu wa kawaida wa 12 mita na uzito wa 88.96 kilo kwa mita, na ni viwandani kulingana na kiwango cha GOST ya Kirusi 53866-2010. Profaili ya reli imeundwa na msingi wa gorofa na kichwa kilicho na pembe ambacho hutoa uso unaoendelea wa kukimbia kwa magurudumu ya crane. Reli ya Crane КР-100 GOST Р 53866-2010 is commonly used in a variety of industrial applications, kama bandari, maghala, and factories, where heavy loads need to be transported over relatively short distances.
According to GOST Р 53866-2010, the specification for Crane rail КР-100 is as follows:
– Standard length: 12 Mita
– Uzito: 88.96 kilo kwa mita
– Vifaa: U71Mn
– Utungaji wa kemikali:
– Carbon (C): 0.65-0.77%
– Silicon (Sc): 0.15-0.35%
– Manganese (Mn): 1.10-1.50%
– Phosphorus (P): max. 0.04%
– Sulfur (S): max. 0.04%
– Mali ya mitambo:
– Nguvu ya Tensile: min. 880 MPa
– Elongation: min. 9%
– Ugumu (HBS): 260-300 at the head
These specifications are important to ensure that the crane rail КР-100 is able to withstand the heavy loads and stresses associated with crane operations, and provide a safe and reliable transport system.
GOST KP100 crane rail is primarily used in the crane running industry, particularly in countries that follow the GOST (GOST) standards system, which includes countries in the former Soviet Union such as Russia, Ukreni, Belarus, Kazakhstan, Uzbekistan, and others. Hata hivyo, it is possible that other countries or industries may also use this type of rail.
The installation of Crane rail КР-100 GOST Р 53866 involves the following steps:
1. Prepare the foundation: The foundation should be level, flat and able to support the weight of the crane rail.
2. Layout the crane rail: The crane rail sections should be carefully laid out according to the design.
3. Position the first section: The first section should be positioned accurately and securely bolted to the foundation.
4. Connect the sections: The remaining rail sections should be connected by fish plates and bolts.
5. Check the rail alignment: The rail should be checked for alignment at every joint.
6. Complete the installation: Once all the sections are securely connected and aligned, the rail should be inspected and tested to ensure it meets the requirements for safe operation.
It is important to follow the manufacturer’s instructions and guidelines when installing crane rail КР-100 GOST Р 53866 to ensure a safe and reliable installation. It is also important to ensure that the installation is done by experienced and qualified professionals to avoid accidents and ensure the proper functioning of the crane rail.
Tunaweza kusambaza reli za chini za gorofa za kimataifa kama hapa chini, Ikiwa unahitaji, tafadhali jisikie huru kutuuliza: