우리와 함께 T/T로 강철 레일 사업을 하는 방법

우리는 고객의 요구 사항으로 T/T 또는 L/C의 지불 기간을 받아들일 수 있습니다., 더 큰 사업 또는 방글라데시 및 파키스탄과 같은 일부 국가의 경우, 그들은 L/C를 사용하고 싶습니다. 소규모 기업용, 클라이언트는 T/T에 의하여 저희를 지불하고 싶으면, T/T is easy to be operated, and can save the operation cost.

Here we introduce the detailed operation process of T/T as below:

  1. You give us the detailed information of buyer’s company (your company), we make Proforma Invoice for you.
  2. You pay for us 30% payment, then send us the payment list.
  3. We get your prepayment and prepare the all goods as soon as possible, when we get the estimated delivery time, we begin to book container (then we’ll tell you the detailed delivery time).
  4. We finish all of the goods and deliver to Tianjin port and load in container (we’ll take detailed photo to you, to show the goods is loaded in container then close and seal it, we will give you the container number and seal number).
  5. After shipping out three days later, we can get the bill of lading and other documents, then we’ll send to you the copy, and you can pay for us the balance 70% payment.
  6. When we get your balance payment, we post the original documents to you, includes Bill of lading, Insurance list, Certificate of origin (Form E), Material test certificate, Commercial invoice, Packing list etc.
  7. Before the container arrive to your port, the shipping company will inform you to prepare the original documents to take the goods.

The delivery time on our quotation just be estimated time, when we begin to produce the goods, we will be able to know the exact delivery time and book the container, so we need consider the producing time, land transportation time, apply custom time etc., usually our freight forwarder request us must deliver to port before 4 일, so we need book the container after ten days later.

Sometime have uncontrollable things happened, like this COVID-19, we want to deliver goods to Labuan, 말레이시아, last time there are four vessels can be chosen, but now only has one vessel, Labuan port is very far away, plus COVID-19, most vessel had been cancelled.

레일의 사용

레일의 종류

표준

철도용 레일 43 kg / m 레일, 50 kg / m 레일,

60 kg / m 레일, 75kg / m 레일, 60N 레일, 75N 레일

TB/T2344-2012, TB/T3276-2011
P50 레일/R50 레일, P65 레일/R65 레일 GOST-R51685
S49 레일, UIC54 레일, UIC60 레일 UIC860
JIS50N 레일, JIS60 레일 JIS E1101
AS50 레일, AS60 레일, AS68 레일 AS1085, 증권 시세 표시기
90RA 레일, 100RE 레일, 115RE 레일, 132RE 레일, 136RE 레일 아레마
TR45 레일, TR50 레일,

TR57 레일, TR68 레일

증권 시세 표시기
BS75A 레일, BS90A 레일, BS100A 레일 BS11 표준
49E1 레일, 50E2 레일, 54E1 레일,

60E1 레일, 60E2 레일

EN 13674-1
스위치 레일 50AT1 레일, 60AT1 레일,

60AT2 레일, 60TY1 레일

TB/T3109-2013
크레인 레일 A45, A55, A65, A75, A100, A120, A150 DIN536
QU70 레일/KP70 레일, QU80 레일/KP80 레일, QU100 레일/KP100 레일,

QU120 레일/KP100 레일, CR175 레일

YB / T5055-2014
ASTM A759-2000
그루브 레일 59R2 레일, 60R2 레일 EN 14811:2006

 


온라인 서비스
라이브 채팅