T / T ile çelik ray işi bizimle nasıl yapılır

Müşterinin gereksinimi olarak T / T veya L / C'nin ödeme süresini kabul edebiliriz, daha büyük işletmeler veya Bangladeş ve Pakistan gibi bazı ülkeler için, L/C kullanmak istiyorlar. Küçük işletmeler için, müşteri bizim için T / T ile ödeme yapmak istiyor, T/T is easy to be operated, and can save the operation cost.

Here we introduce the detailed operation process of T/T as below:

  1. You give us the detailed information of buyer’s company (your company), we make Proforma Invoice for you.
  2. You pay for us 30% payment, then send us the payment list.
  3. We get your prepayment and prepare the all goods as soon as possible, when we get the estimated delivery time, we begin to book container (then we’ll tell you the detailed delivery time).
  4. We finish all of the goods and deliver to Tianjin port and load in container (we’ll take detailed photo to you, to show the goods is loaded in container then close and seal it, we will give you the container number and seal number).
  5. After shipping out three days later, we can get the bill of lading and other documents, then we’ll send to you the copy, and you can pay for us the balance 70% payment.
  6. When we get your balance payment, we post the original documents to you, includes Bill of lading, Insurance list, Certificate of origin (Form E), Material test certificate, Ticari fatura, Packing list etc.
  7. Before the container arrive to your port, the shipping company will inform you to prepare the original documents to take the goods.

The delivery time on our quotation just be estimated time, when we begin to produce the goods, we will be able to know the exact delivery time and book the container, so we need consider the producing time, land transportation time, apply custom time etc., usually our freight forwarder request us must deliver to port before 4 Gün, so we need book the container after ten days later.

Sometime have uncontrollable things happened, like this COVID-19, we want to deliver goods to Labuan, Malezya, last time there are four vessels can be chosen, but now only has one vessel, Labuan port is very far away, plus COVID-19, most vessel had been cancelled.

RAYLARIN KULLANIMI

RAY TİPİ

STANDART

Demiryolu için Demiryolu 43 kg/m ray, 50 kg/m ray,

60 kg/m ray, 75kg/m ray, 60N raylı, 75N raylı

TB/T2344-2012, TB/T3276-2011
P50 ray/R50 ray, P65 ray/R65 ray GOST-R51685
S49 ray, UIC54 ray, UIC60 ray UIC860 Serisi
JIS50N ray, JIS60 ray JIS E1101
AS50 ray, AS60 ray, AS68 ray AS1085 Serisi, BHP RT STD
90RA rayı, 100RE rayı, 115RE rayı, 132RE rayı, 136RE rayı AREMA
TR45 ray, TR50 ray,

TR57 ray, TR68 ray

ASTM
BS75A ray, BS90A ray, BS100A ray BS11 STANDARDI
49E1 ray, 50E2 ray, 54E1 ray,

60E1 ray, 60E2 ray

EN 13674-1
Anahtar Rayı 50AT1 rayı, 60AT1 rayı,

60AT2 ray, 60TY1 ray

TB/T3109-2013
Vinç Rayı A45 Serisi, A55 Serisi, A65 Serisi, A75 Serisi, A100 Serisi, A120 Serisi, A150 Serisi DIN536 Serisi
QU70 ray/KP70 ray, QU80 ray/KP80 ray, QU100 ray/KP100 ray,

QU120 ray/KP100 ray, CR175 ray

YB/T5055-2014
ASTM A759-2000
Yivli Ray 59R2 rayı, 60R2 rayı EN 14811:2006

 


Online Servis
Canlı Sohbet