Cần cẩu ray КР-100 GOST Р 53866-2010 là một loại đường ray cụ thể được thiết kế để chịu được tải trọng nặng và ứng suất liên quan đến hoạt động của cần trục. Nó có chiều dài tiêu chuẩn là 12 mét và trọng lượng của 88.96 kilôgam mỗi mét, and is manufactured in accordance with the Russian GOST standard 53866-2010. The rail profile is shaped with a flat base and an angled head that provides a continuous running surface for crane wheels. Cần cẩu ray КР-100 GOST Р 53866-2010 is commonly used in a variety of industrial applications, chẳng hạn như cổng, Kho, and factories, where heavy loads need to be transported over relatively short distances.
According to GOST Р 53866-2010, the specification for Crane rail КР-100 is as follows:
– Standard length: 12 Mét
– Trọng lượng: 88.96 kilôgam mỗi mét
– Vật liệu: U71Mn
– Thành phần hóa học:
– Cacbon (C): 0.65-0.77%
– Silic (Si): 0.15-0.35%
– Mangan (Mn): 1.10-1.50%
– Phốtpho (P): Max. 0.04%
– Sulfur (S): Max. 0.04%
– Tính chất cơ học:
– Độ bền kéo: Phút. 880 Mpa
– Độ giãn dài: Phút. 9%
– Độ cứng (HBS): 260-300 at the head
These specifications are important to ensure that the crane rail КР-100 is able to withstand the heavy loads and stresses associated with crane operations, and provide a safe and reliable transport system.
GOST KP100 crane rail is primarily used in the crane running industry, particularly in countries that follow the GOST (GOST) standards system, which includes countries in the former Soviet Union such as Russia, Ukraina, Belarus, Kazakhstan, Uzbekistan, và những người khác. Tuy nhiên, it is possible that other countries or industries may also use this type of rail.
The installation of Crane rail КР-100 GOST Р 53866 involves the following steps:
1. Prepare the foundation: The foundation should be level, flat and able to support the weight of the crane rail.
2. Layout the crane rail: The crane rail sections should be carefully laid out according to the design.
3. Position the first section: The first section should be positioned accurately and securely bolted to the foundation.
4. Connect the sections: The remaining rail sections should be connected by fish plates and bolts.
5. Check the rail alignment: The rail should be checked for alignment at every joint.
6. Complete the installation: Once all the sections are securely connected and aligned, the rail should be inspected and tested to ensure it meets the requirements for safe operation.
It is important to follow the manufacturer’s instructions and guidelines when installing crane rail КР-100 GOST Р 53866 to ensure a safe and reliable installation. It is also important to ensure that the installation is done by experienced and qualified professionals to avoid accidents and ensure the proper functioning of the crane rail.
Chúng tôi có thể cung cấp đường ray đáy phẳng tiêu chuẩn quốc tế như dưới đây, nếu bạn cần nó, Xin vui lòng hỏi chúng tôi: