Bagaimana melakukan bisnis rel baja dengan T / T dengan kami

Kami dapat menerima jangka waktu pembayaran T / T atau L / C sebagai persyaratan klien, untuk bisnis yang lebih besar atau beberapa negara seperti Bangladesh dan Pakistan, mereka ingin menggunakan L/C. Untuk bisnis kecil, klien ingin membayar kami dengan T / T, T/T is easy to be operated, and can save the operation cost.

Here we introduce the detailed operation process of T/T as below:

  1. You give us the detailed information of buyer’s company (your company), we make Proforma Invoice for you.
  2. You pay for us 30% payment, then send us the payment list.
  3. We get your prepayment and prepare the all goods as soon as possible, when we get the estimated delivery time, we begin to book container (then we’ll tell you the detailed delivery time).
  4. We finish all of the goods and deliver to Tianjin port and load in container (we’ll take detailed photo to you, to show the goods is loaded in container then close and seal it, we will give you the container number and seal number).
  5. After shipping out three days later, we can get the bill of lading and other documents, then we’ll send to you the copy, and you can pay for us the balance 70% payment.
  6. When we get your balance payment, we post the original documents to you, includes Bill of lading, Insurance list, Certificate of origin (Form E), Material test certificate, Faktur komersial, Packing list etc.
  7. Before the container arrive to your port, the shipping company will inform you to prepare the original documents to take the goods.

The delivery time on our quotation just be estimated time, when we begin to produce the goods, we will be able to know the exact delivery time and book the container, so we need consider the producing time, land transportation time, apply custom time etc., usually our freight forwarder request us must deliver to port before 4 Hari, so we need book the container after ten days later.

Sometime have uncontrollable things happened, like this COVID-19, we want to deliver goods to Labuan, Malaysia, last time there are four vessels can be chosen, but now only has one vessel, Labuan port is very far away, plus COVID-19, most vessel had been cancelled.

PENGGUNAAN REL

JENIS REL

STANDAR

Rel untuk Kereta Api 43 rel kg/m, 50 rel kg/m,

60 rel kg/m, 75rel kg/m, 60N rel, 75N rel

TB/T2344-2012, TB/T3276-2011
Kereta api P50/Rel R50, Rel P65/Rel R65 GOST-R51685
Rel S49, Rel UIC54, Rel UIC60 UIC860
Rel JIS50N, Rel JIS60 JIS E1101
Rel AS50, Rel AS60, Rel AS68 AS1085, BHP RT STD
90Rel RA, 100Rel RE, 115Rel RE, 132Rel RE, 136Rel RE AREMA
Rel TR45, Rel TR50,

Rel TR57, Rel TR68

ASTM
Rel BS75A, Rel BS90A, Rel BS100A STANDAR BS11
49Rel E1, 50Rel E2, 54Rel E1,

60Rel E1, 60Rel E2

EN 13674-1
Rel Sakelar 50Rel AT1, 60Rel AT1,

60Rel AT2, 60Rel TY1

TB/T3109-2013
Rel Derek A45, A55, A65, A75, A100, A120, A150 DIN536
Rel QU70/Kereta api KP70, Rel QU80/Kereta api KP80, Rel QU100/Kp100 kereta api,

Kereta api QU120/Kp100 kereta api, Rel CR175

YB/T5055-2014
ASTM A759-2000
Rel Beralur 59Rel R2, 60Rel R2 EN 14811:2006

 


Layanan Online
Obrolan Langsung